|
Rig #15
Class III Skidded Double
(Not Available)
Rig Manager: Colin Dinwoodie
Drawworks:
- KSM550 H
- 42 X 10 Main Drum c/w Eaton 224 Friction Brake Crownsaver
- Rated 4700m with 73mm Tubing
Derrick:
- 108’ Telescopic Double, 6 or 8 Line
- Rated at 240,000 lbs with 8 Lines
- Racking Capacity for 4700m with 73mm Tubing
- No Rod Basket
Pump: Skidded
- National JWS 340
- 4” x 5” Triplex
- 7 Valve Manifold 5000 psi
Tank:
- 48m³ c/w Trough, Degasser, Mixing Hopper and Guns
Combination Building:
- 17m skidded with twin light towers
Lightplant:
- 55 kw Isuzu/Stamford Generator with twin lighttower on Combination Unit
BOP’s & Accumulator Class III:
- 7 1/16" Hydril Double Gate 5000 psi
- 7 1/16” Shaffer Spherical 5000 psi
- 88 Gallon 4 Station Remote in Combination Building
Tools:
- 150 Ton Handling Equipment, Rig Matting Piperacks & catwalks
|
 |
|